Matters needing attention:

1. The place where the equipment is installed should not have accumulated water

2. The outlet pipe of the integrated sewage treatment equipment should be below 0.4m relative to the ground level

3. There should be no heavy objects or large vehicles passing over the equipment

4. It is recommended to do necessary anti-corrosion work and pay attention to ensuring the normal operation of the equipment

5. It is recommended that the integrated sewage treatment equipment should not empty the internal sewage to prevent equipment fluctuations